
An FHA 203(k) lets you buy a home that needs work and finance the repairs in the same loan. It's one of the most useful tools in Utah's market, where the homes that need a new roof or an updated kitchen are often the ones still in reach. It also takes more steps than a regular purchase, so it helps to know the order before you start.
Not sure whether a 203(k) or a conventional renovation loan fits your project? Start with our 203(k) vs. HomeStyle comparison.
Step 1: Get pre-approved for the right version
There are two kinds of 203(k):
- Limited 203(k) (formerly called the Streamline): up to $75,000 of non-structural work like a roof, furnace, windows, flooring, paint, or a kitchen update. No consultant required.
- Standard 203(k): larger and structural projects, like moving walls, an addition, or foundation repairs. Minimum of $5,000 in repairs, and a HUD-approved consultant is required.
Your pre-approval should say you're approved for a 203(k), not just an FHA loan, so your agent can write offers with the extra time a renovation loan needs.
Step 2: Find the home and write a renovation-friendly offer
When you write the offer, build in time. Ask for a longer closing period, usually 45 to 60 days, and make sure you'll have access to the home for contractors to walk through and bid. Tell the listing agent up front that you're using a 203(k), so nobody is surprised by the extra visits.
Step 3: Get contractor bids
You'll need a licensed contractor's detailed, itemized bid for every repair. Vague bids slow everything down. Each line should say what's being done, the materials, and the cost.
Choose a contractor who has worked on renovation loans before. They'll be paid in stages after inspections instead of all up front, and experienced 203(k) contractors know how that works.
Step 4: The 203(k) consultant (Standard only)
On a Standard 203(k), a HUD-approved consultant inspects the home and writes the official scope of work, sometimes called the work write-up. That document becomes the plan the lender, the appraiser, and the contractor all work from. The consultant also inspects the work before each payment to the contractor. The consultant's fee can usually be financed into the loan.
Step 5: The as-completed appraisal
The appraiser values the home as it will be after the repairs are done. That as-completed value, along with the purchase price and repair costs, sets how much you can borrow. Strong bids and a clear scope of work make this step go smoothly.
Step 6: Underwriting and closing
Underwriting reviews you, the home, the bids, and the scope of work together. At closing, the repair money doesn't go to you or the contractor. It goes into an escrow account, along with a contingency reserve for surprises, which is common in older Utah homes.
Step 7: Construction and draws
After closing, the contractor starts work and is paid in draws as stages are finished and inspected. On a Limited 203(k), the draws are fewer and simpler. On a Standard 203(k), the consultant inspects before each draw.
If the home can't be lived in during a Standard 203(k), up to six months of mortgage payments can be built into the loan, so you aren't paying rent and a mortgage at once.
Step 8: Final inspection and closeout
When the work is done, a final inspection confirms it matches the scope. The last payment goes to the contractor, and any unused contingency money is applied to your loan balance.
Tips that keep a 203(k) on schedule
- Get bids early. The bid is usually the slowest piece.
- Keep the scope realistic. Projects that grow mid-loan need a change order.
- Stay in touch weekly. Your lender, agent, contractor, and consultant all need the same information.
- Plan for older-home surprises. Wiring, plumbing, and sewer lines often show up once walls open.
Learn more about the program on our FHA 203(k) page, or bring us a listing and we'll tell you whether it fits a Limited or Standard 203(k). Book a free call.